PROJECT UPDATE – CITADINES PEARL HOI AN HOTEL

HEADQUARTERS

  • Hotline:0918 288 811

Hanoi area

Danang area

Buon Me Thuot area

SCL Delta Region

Details

PHASE 2: FINAL COAT APPLICATION TO COMPLETE THE ACRYLIC WATERPROOFING SYSTEM

After completing the initial base coat, our engineering team proceeded with the application of final coats to ensure a comprehensive waterproofing solution while enhancing the aesthetic quality of the project.

🔨 Scope of Work:

  • Application of finishing layers using AM FLEXPROOF AC – a high-performance acrylic waterproofing material.

🧪 Purpose of Final Coats:

  • Enhanced UV resistance, ensuring long-lasting color stability.

  • Protection against environmental degradation, especially under coastal climate conditions.

  • A smooth, uniform finish that meets high architectural standards.

🎯 Key Advantages:

  • Complete protection for external wall surfaces.

  • Fulfillment of both technical and design requirements.

  • Reduced long-term maintenance costs.

📸 Browse the gallery below to see the surface after final coat completion.

🔨 Our Commitment:

With a team of skilled technicians, a standardized construction process, and top-quality materials, we are dedicated to delivering waterproofing solutions that are durable, aesthetically pleasing, and highly effective for every project.

📞 Contact us today for expert consultation on the most suitable waterproofing solutions for your building.

Gọi Chúng Tôi Facebook Wechat Zalo Viber
Back To Top